The ASHRAE Guideline defines the commissioning process
as "a quality-oriented process for achieving, verifying,
and documenting that the performance of facilities,
systems, and assemblies meets defined objectives and
criteria".
Commissioning of your new buildings systems or
Retrocommissioning existing systems is
one of the most important factors when trying to insure
equipment longevity, energy efficiency, occupancy
comfort and operational cost control in your facility.
The C&C Group will help you target your commissioning
goals for your new or existing facility.
New Construction Commissioning Goals:

Provide documented confirmation that a facility fulfills
the functional and
performance requirements of the
building owner, occupants, and operators.
Establish and document the owner’s criteria for
Systems
function
Systems
performance
Systems
maintainability
Verify and document compliance criteria during
Design
phase
Construction phase
Systems
start-up
Initial
period of operation
A successful commissioning process ensures that all
building systems perform
interactively according to the
contract documents, the owner’s objectives and
operational needs.
Existing Systems Retrocommissioning Goals:

Restore equipment to its proper operational state
Reduce complaints
Reduce energy and demand costs
Increase equipment life
Improve indoor air quality
Increase tenant satisfaction
Improve facility operation and maintenance
Reduce staff time spent on emergency calls |